OilDri UK - Spill absorbent manufacturer

IMG_8658 (1).jpg

Following on from the 5 yearly EICR, there were major issues discovered in parts of the Bagging area installation. Incorrect protective devices, Ingress protection not met, Poor lighting, Old technology control system and redundant Socket outlets, switches and cabling as far as the eye could see!!

OilDri.jpg

​

A planned shutdown allowed us the small window required to fully identify, remove, relocate and reinstall the above equipment to a more user friendly location. We installed JCC LED non-corrosive light fittings, Gewiss 1ph and 3ph RCD sockets, Click metal clad sockets and switches, A Crabtree 3ph MCCB panel and a 3ph Distribution board.

IMG_8661 (1).jpg

​

Another string to our bow comes in the form of being able to build and install control panels in-house as seen to the left and below.

Projects: Projects
IMG_8664 (1).jpg
IMG_8667 (1).jpg
IMG_8663 (1).jpg

​

​

IMG_8666 (1).jpg
IMG_8660 (1)_edited.jpg

​

​

Doddington Hall

IMG_8348 (1).jpg

After the owners insurance company had requested an EICR be completed due to the age of the property, there were multiple issues to address.

IMG_8386 (1).jpg

​

As seen below the installed equipment just wasn't to regulation and required upgrading.

Other remedial works included multiple Sub-main upgrades, Consumer unit relocation, replacement of the Sub-main fused switches including a complete overhaul of the mains potion setup.

IMG_8406 (1).jpg

​

Some of the issues discovered were,

  • Undersized Sub-main cables.

  • Damaged Sub-main cables.

  • Unidentified circuits.

  • Incorrect protective device ratings.

  • Undersized meter tails.

  • Multiple circuits in one protective device.

Projects: Projects
IMG_8407 (1).jpg
IMG_8345 (1).jpg
IMG_8405 (1).jpg
IMG-20251015-WA0008.jpg

​

​

WhatsApp Image 2025-10-15 at 14.06.30_8af4913b.jpg
WhatsApp Image 2025-10-15 at 14.06.29_003cf26c.jpg

​

​

Annex Refurbishment

This returning customer contacted us regarding some electrical work in a very run down Annex.

We discussed layout ideas with an view of what they wanted at the finish of the project.

First step was repairing the ceiling and installing the LED spotlights.

Then came the DPM, sub-floor and insulation to level the floor heights.

The Caberdeck was then glued and screwed in position. 

Stud walls went up next with the required electrics and plumbing installed.

Plasterboarding our last step before the plasterers came in to skim the complete area.

Projects: Projects
WhatsApp Image 2026-02-27 at 11.43.53.jpeg
WhatsApp Image 2026-02-27 at 11.43.54 (11).jpeg
WhatsApp Image 2026-02-27 at 11.43.54 (13).jpeg
WhatsApp Image 2026-02-27 at 11.43.54 (10).jpeg
WhatsApp Image 2026-02-27 at 11.43.54 (17).jpeg
WhatsApp Image 2026-02-27 at 11.43.54 (21).jpeg

Returning once the plastering and decoration had been completed, the 2nd fixing of the electrics, plumbing and carpentry could be undertaken.​​

WhatsApp Image 2026-02-27 at 11.43.54 (23).jpeg